摘要:簡(jiǎn)介:Caledyne公司的全金屬井下封隔系統(tǒng),實(shí)現(xiàn)了真正的全部金屬體封隔油井,安全可靠,能夠抵抗極端條件。該公司采用了全金屬封隔的可回收橋塞(RBP),最近應(yīng)用于馬來(lái)西亞Bunga Kekwa一項(xiàng)目中,來(lái)臨時(shí)封堵一井。該RBP下于7,24...
簡(jiǎn)介:Caledyne公司的全金屬井下封隔系統(tǒng),實(shí)現(xiàn)了真正的全部金屬體封隔油井,安全可靠,能夠抵抗極端條件。該公司采用了全金屬封隔的可回收橋塞(RBP),最近應(yīng)用于馬來(lái)西亞Bunga Kekwa一項(xiàng)目中,來(lái)臨時(shí)封堵一井。該RBP下于7,244 英尺處,經(jīng)過(guò)兩個(gè)月的井下作業(yè),取出后完好無(wú)損,顯示了其良好的機(jī)械性能。


Caledyne’s metal-to-metal (MTM) downhole seal system provides a complete metal barrier that is reliable, durable, and resistant to extreme conditions.

The company’s retrievable bridge plug (RBP), which incorporates the MTM seal, was recently deployed for Talisman on the Bunga Kekwa project in Malaysia to temporarily plug a well.

The RBP was installed to a depth of 7,244 ft (2,208 m). The assembly was run, and the setting tool activated, which sheared off the bridge plug and removed it from the well.

Well deviation at the RBP was 45° and was successfully pressure-tested to 350 psi. After one hour, a straight-line pressure test with zero dropoff was recorded, and after 24 hours, there was no pressure buildup in the tubing. A debris catcher was then installed above the RBP to keep out cuttings.

A second tubing cut was required below the original cut after problems were encountered during repair activities. Because this process was performed without a debris catcher, considerable debris landed on top of the RBP. Multiple bailer and venture runs were carried out to remove the debris. The new completion components were installed a month after the RBP.

When the plug was removed, the large amount of debris prevented the pulling tool from latching the fishing neck on the RBP, which resulted in further bailing runs to remove debris.

At this point, the plug was released but could not be pulled. Several maximum overpulls of 30,000 lbf were applied that eventually moved the plug slowly uphole.

With the plug removed, the RBP appeared to be in good condition with the MTM seal fully intact, sitting just above gauge diameter. The resilience of the RBP reflects the mechanical strength, construction, integrity, and design of the MTM seal, which had been downhole for two months.

Since this initial deployment, the operator has ordered several additional RBP units for similar reservoir applications. 

楊寶劍 是振威(全球)石油網(wǎng)的高級(jí)技術(shù)編輯,在石油技術(shù)資訊行業(yè)有八年的學(xué)識(shí)和經(jīng)驗(yàn)。他源源不斷地提供石油行業(yè)全球最新的技術(shù)創(chuàng)新、研發(fā)成果、現(xiàn)場(chǎng)應(yīng)用情況等信息。如果你對(duì)該項(xiàng)新技術(shù)有任何的疑問(wèn),或者對(duì)“新技術(shù)新產(chǎn)品”未來(lái)的內(nèi)容有任何問(wèn)題或建議,請(qǐng)聯(lián)系楊寶劍編輯 +86 10-58236512 Email:allenyo@zhenweiexpo.com 歡迎與行業(yè)互動(dòng)!
關(guān)鍵字: Caledyne 全金屬 井下 封隔系統(tǒng) 
關(guān)于我們 | 會(huì)員服務(wù) | 電子樣本 | 郵件營(yíng)銷(xiāo) | 網(wǎng)站地圖 | 誠(chéng)聘英才 | 意見(jiàn)反饋
Copyright @ 2011 CIPPE.NET Inc All Rights Reserved 全球石油化工網(wǎng) 版權(quán)所有 京ICP證080561號(hào)