九色精品系列精品在线探花|黄色视频网页九九国产精品|国产一区国产一区国产一区国产二区|亚洲av中文无码乱人伦在线咪咕|国产精品日韩无码加勒比视频一区|午夜剧场欧美A级毛片|国产无套内射普通话|亚洲国产成人在线视频观看|日本3p群交干b|久久精品自慰

首頁 資料分類 用戶榜 | 積分說明    

  ·Design criteria, planning critical for successful


資料星級: 資料格式:doc
上 傳 者:liuwan 下載次數(shù):0
上傳時間:2012-03-06 14:13:26

5分
53KB
推薦本資料到: 開心網(wǎng) 人人 豆瓣 新浪
收藏  舉報  
  發(fā)送給好友

  詳細(xì)介紹: 發(fā)表評論   
Conditions in deepwater environments have required operators and service companies to resolve many major challenges to well completion. And because these environments are providing some of the biggest opportunities for new oil and gas prospects, it has been well worth the effort to consider these problems and develop new solutions.
  該用戶還有這些資料: 更多   

managing deepwater ...

MMS JIP – SAFETY OF...

Well integrity in d...

System requirements...

采辦包中的材料、制造和地面處理要求

地面采油樹、采油樹閥門和井口頭

附件3中的內(nèi)容-水密完整性

附件3中的內(nèi)容


 
  其他相關(guān)資料: 更多   

DNV-OS-C101 design

Fault intersections...

Fault intersections...

Screening Criteria ...

Well Engineering fo...

Directional Planning

Well-Testing Planni...

Design Features MC...